Web scraping tools help you extract publicly available data from websites at scale. Depending on the tool you use, the quality, accuracy, and reliability of the extracted data can vary significantly.

While there are many web scraping tools on the market, each comes with its own strengths, limitations, and feature sets. Some tools are completely free, others are paid, and many now offer AI-powered web scraping capabilities designed to handle dynamic content, anti-bot protections, and complex data structures.

After testing a wide range of web scraping solutions—from well-known platforms to lesser-known tools—we identified 12 free and AI-powered web scraping tools that stand out as the best options for collecting website data in 2026 at zero or low cost.

To ensure a fair comparison, we evaluated each tool using the following criteria:

  • Bot protection handling: How well the tool deals with CAPTCHAs, IP blocks, and anti-scraping systems
  • Scalability: How easily the tool supports higher scraping volumes
  • Features: Built-in tools like proxy management, JavaScript rendering, scheduling, and structured data outputs
  • Ease of use: Setup effort, documentation, and learning curve
  • Pros and cons: Main strengths and limitations
  • Pricing: Free plans, trials, and upgrade options

Let’s explore the 12 best free and AI-powered web scraping tools available in 2026.

Comparison of Best Free and AI Web Scraping Tools

Need to see the 12 free web scraping tools side-by-side? See how they compare on their capabilities, AI features, and starting price to help you find the free web scraping solutions for your data collection needs.

ToolType/ApproachFree TierAI Features?Starting Paid PriceBest For
ScraperAPIAPI-based scraping serviceYes (5,000 credits then 1000 p/m) ML-based proxy rotation, ML for complex sites$49/month (100k requests)Developers needing an easy-to-use, scalable, automated scraping platform
Bright DataAll-in-one Scraping PlatformYes (7-day trial ($500 credit match)AI-powered Web Scraper IDE, Self-healing scrapers$1.50/1k records (PAYG) or $499/moEnterprise-grade; massive datasets, and total compliance
ParseHubNo-code, desktop/cloudYes (5 projects)ML for complex sites$189/month (Standard)Non-coders handling dynamic or AJAX pages
ScrapyOpen-source Python frameworkYes (unlimited)No (manual coding)FreeExperienced developers building custom scrapers
DecodoAPI-based serviceYes (1,000 credits)AI Parser, LangChain, n8n, and MCP integrations$0,08/1K requestsStraightforward setup and integrations with popular automation tools
Webscraper.ioBrowser extension & cloudYes (extension)No (primarily manual setup)$50/month (Project Plan)Beginners needing simple point-and-click setups
ScrapingBeeAPI-based serviceYes (1,000 credits)Beta AI extraction (5 extra credits/use)$49/month (150k credits)Price monitoring, SEO analysis, JS-heavy sites
Bardeen.AIChrome extension, no-codeYes (100 credits)AI prompts & playbooks$30/month (18k credits/year)Automated workflows, integrating with spreadsheets/excel files
Browse AINo-code, cloud-basedYes (50 credits)Some adaptation to changes$48.75/month (2,000 credits)Quickly extracting & monitoring website data
DiffbotAI-powered data extractionYes (10,000 credits trial)Yes (NLP/Computer Vision)$299/month (Startup)Structured data from news, e-commerce, & more
ScrapeStormNo-code, AI-assistedTrial (10 tasks)AI-powered data recognition$49.99/month (Professional)Beginners & pros needing visual + AI scraping
Databar.aiNo-code, data enrichmentNo free credits are listed, but offers low-tier paidAI for lead qualification & data enrichment$36/month (2,000 credits)Integrating scraped data into dynamic reports & visualizations

7 Best Free Web Scraping Tools

1. ScraperAPI – Best Free Web Scraping Tool

ScraperAPI may be considered the best web scraping tool on the market. It’s designed to collect real-time data from websites at a large scale and is an excellent fit for diverse web scraping use cases, from simple data extraction to enterprise-grade scraping workflows. It handles proxies, browsers, and CAPTCHAs, allowing you to extract clean, structured data from any website without managing scraping infrastructure or getting blocked.

ScraperAPI is the best free web scraping tool

With ScraperAPI, you can bypass geographical restrictions, render JavaScript-heavy websites, and retrieve data at an enterprise-level scale using a single web scraping API—without paying “the brand tax.” With this tool, you’ll access a pool of over 150M premium proxies (from datacenter to residential and mobile) across 150 countries, with machine-learning–driven proxy selection and rotation built directly into the scraping tool. No management is needed from the client’s side.

ScraperAPI’s web scraping engine also includes advanced anti-bot detection to handle sophisticated bot blockers like DataDome, PerimeterX, and similar systems, helping ensure near 100% scraping success rates. Getting started with ScraperAPI is very easy—users only need an API key and a target URL to begin automated web scraping at scale.

Let’s take a closer look at some of ScraperAPI’s best web scraping automation features.

Features That Make ScraperAPI the Best Web Scraping Tool

A. ScraperAPI’s DataPipelines Offers a Cloud-Hosted Scraping Scheduler

ScraperAPI’s DataPipeline is a user-friendly web scraping scheduler that simplifies and automates your web scraping tasks using its visual interface or dedicated endpoints for precise scheduling. With DataPipeline, you can simultaneously run up to 10,000 URLs (per project), keywords, Amazon ASINs, or Walmart IDs (to name a few domains) and build complex, recurrent scraping jobs.

Users can schedule pre-configured jobs for custom URLs and structured data endpoints, get their results in JSON or CSV, or have them delivered to a webhook. This makes it easier to integrate scraping outputs into existing data pipelines.

ScraperAPIs DataPipeline project dashboard

Datapipeline also has an intuitive dashboard integrated into the feature. You can monitor the progress of your scraper, cancel running jobs if needed, review your configurations, and download the scraped data once the jobs are complete. You can also monitor all of this information using the corresponding endpoints—no need for 3rd-party tools or to get out of your development environment.

DataPipeline also includes an intuitive dashboard integrated directly into the ScraperAPI web scraping platform. You can monitor the progress of your scraper, cancel running jobs if needed, review your configurations, and download the scraped data once the jobs are complete. You can also monitor all of this information using the corresponding endpoints—no need for 3rd-party tools or to get out of your development environment.

B. ScraperAPI’s Render Instruction Sets

The Render Instruction Set allows you to send instructions to a headless browser controlled by ScraperAPI’s web scraping engine, guiding it on what actions to perform during page rendering. These instructions are passed as a JSON object in the API request headers.

Note: Refer to the Render instruction set documentation to see a complete list of supported instructions and learn how to customize your scraping tasks further.

These instructions give you the same control over page rendering as a traditional headless browser—handling challenges like infinite scroll, dynamic content loading, or user interactions—but without the setup complexity or infrastructure costs typically associated with browser-based web scraping.

C. ScraperAPI’s Structured Data Endpoints (SDEs)

ScraperAPI also offers structured data endpoints designed specifically for web scraping popular platforms such as Amazon, Walmart, eBay, and Google. The Structured Data Endpoints feature allows you to scrape any ecommerce product page without writing complex parsing logic or constantly adapting to website updates, regardless of the scale of your project.

ScraperAPI’s SDEs work with both the standard API and the Async API, enabling you to manage millions of web scraping requests asynchronously while maintaining high success rates and faster throughput for large-scale scraping projects.

Pros and Cons of ScraperAPI as a Web Scraping Tool

Pros

  • Pool of over 150M IPs
  • Easy to use and integrate
  • Smart proxy rotation
  • Handles proxies, browsers, and CAPTCHAs
  • Scalable and reliable
  • Excellent documentation and support
  • High uptime
  • Unlimited bandwidth
  • Geotargeting to over 150 countries

Cons

  • No PAYG pricing
  • Limited geotargeting in lower tiers

Pricing: ScraperAPI Web Scraping Tool

ScraperAPI offers a generous free tier, allowing you to test the full web scraping platform before committing to a paid plan. Paid plans start at a competitive price, and offer increased request limits, faster speeds, and dedicated support. Here’s a more comprehensive breakdown:

  • Free Plan: 5,000 API credits available upon signup, followed by 1,000 free credits each month, supporting up to 5 concurrent connections.
  • Hobby Plan: Priced at $49/month, offering 100,000 API credits.
  • Startup Plan: Available for $149/month, providing 1,000,000 API credits.
  • Business Plan: At $299/month, you receive 3,000,000 API credits.
  • Enterprise Plan: Custom pricing applies for access to over 3,000,000 API credits.

ScraperAPI Reviews and Ratings

  • Trustpilot rating — 4.7

Best Cloud based scraping API

“As a developer I always wanted to have a cloud based solution that doesn’t need me to install headless browsers or dealing with costly proxies. Thanks to ScraperAPI that made things easier. All is required to hit a certain URI to scrape data and get desired results. Highly recommended”

Trustpilot rating

2. Bright Data

Bright Data is a leading web data platform that offers a massive, ethically-sourced proxy network and sophisticated automated scraping tools. It is particularly well-suited for organizations that need to collect data at an immense scale while maintaining high success rates against the most advanced anti-bot protections.

Features That Make Bright Data a Top Contender

  • Web Scraper IDE: An AI-powered environment that provides ready-made scraping templates and code snippets. It features “self-healing” capabilities, where the AI automatically adjusts the scraping logic if a website’s layout changes, significantly reducing maintenance time.  
  • Automated Browser: A high-performance headless browser that handles CAPTCHA solving, browser fingerprinting, and automatic retries natively. This allows users to focus on the data rather than the infrastructure.  
  • Ready-to-Use Datasets: For businesses that prefer not to manage scrapers at all, Bright Data offers a “Marketplace” where you can purchase pre-collected, structured datasets from major platforms like Amazon, LinkedIn, and YouTube.  
  • Industry-Leading Compliance: Bright Data is widely recognized for its commitment to ethical data collection, ensuring all scraping activities are compliant with GDPR and CCPA standards.

Pros and Cons

ProsCons
Access to over 150 million real residential IPs across 195 countriesHigher starting price for monthly commitments compared to hobbyist tools
Powerful “Super Proxies” that load-balance requests for maximum speedThe advanced feature set can result in a steeper learning curve for beginners
Natively integrates with popular tools like AWS, Snowflake, and various marketing platforms
Precise geotargeting down to the city and ZIP code level

Pricing

Bright Data offers a flexible pricing structure that includes a competitive pay-as-you-go option for smaller projects.  

  • [Free Trial: A 7-day trial is available for businesses, along with a dollar-for-dollar match on your first deposit up to $500.  
  • Pay-as-you-go: Starts at approximately $1.50 per 1,000 records.  
  • Micro-Package: A low-commitment tier starting at $10/month.  
  • Subscription Plans: Range from $499/month (Growth) up to $1,999/month (Premium) for high-volume enterprise users.

3. ParseHub

ParseHub is an intuitive, no-code tool that easily enables users to extract data from websites. Leveraging machine learning, it can navigate complex sites, including those with JavaScript, AJAX, and dynamic content. Users can directly choose data elements on a webpage, and ParseHub will generate the corresponding data extraction commands.

Parsehub scraping infrastructure dashboard page

The tool offers both a desktop application and cloud-based services, allowing for flexible data collection and integration into various workflows. To use ParseHub, open a website of your choice and click on the data you want to extract. There’s no coding required, making this tool super easy to use.

Pros and Cons

ProsCons
Simple interface that’s easy to useThe free version comes with limited features
Rotating proxy supportHigher-tier plans can be expensive for small businesses or individual users
Scheduled runsHigh learning curve for advanced features
Cloud-based support (on paid plans)Limited customization (compared to code-based web scraping tools)
Multiple data export formats

Pricing

  • Free Plan: Allows up to 5 public projects, 200 pages per run.
  • Standard Plan: Priced at $189 monthly, includes 20 private projects, 10,000 pages per run.
  • Professional Plan: Priced at $599 monthly, offers 120 private projects and unlimited pages per run.
  • Enterprise Plan: Custom pricing.

ParseHub’s pricing is based on its scraping speed and efficiency. This structure enables businesses to use the tool for free indefinitely. The free plan allows users to retain data from five public projects for up to 14 days. Premium subscription packages also have a dedicated account manager and specialized experts to monitor the data scraping for you.

For a detailed comparison of scraping capabilities, pricing, and success rates, check out the best ParseHub alternatives.

4. Scrapy

Scrapy is a robust, open-source framework built for web scraping using Python. While highly flexible and ideal for large-scale projects, it requires coding knowledge and may not be suitable for beginners. With Scrapy, you write Spiders to retrieve HTML pages from websites, scrape the data you want, clean and validate it, and store it in the data format you want.

Scrapy infrastructure dashboard page

Unlike most other tools on our list, Scrappy is an open-source and collaborative framework for Python developers who want to build their own scalable web crawlers. Scrappy’s biggest advantage is that it’s free to use. The only drawback is that you must manually code advanced features like rotating proxies into the web scraper using middleware and other library imports.

Note: you can integrate ScraperAPI with your Scrapy spiders, automating all the necessary processes to bypass advanced bot blockers.

Pros and Cons

ProsCons
Highly flexibleNot beginner-friendly
Suitable for large-scale projectsRequires coding knowledge
Active community supportOnly compatible with Python
Scrapy requests are scheduled and processed asynchronously

Pricing 

Scrapy is free and open-source!

5. Decodo

Decodo (formerly Smartproxy) is a scraping and proxy platform that combines a pool of over 125 million IPs with a Web Scraping API capable of handling CAPTCHAs, JavaScript rendering, and geo-targeting. The platform includes ready-made scraping templates, browser extensions, and integrations with tools like LangChain and n8n, which can reduce setup time for both developers and less technical users. A 7-day free trial with 1,000 API requests allows new users to test its advanced features before moving to a paid plan.

Pros and Cons

ProsCons
Straightforward API and integrations with popular automation toolsDoesn’t support parsing for certain targets
7-day free trial for initial testingFree trial is limited in volume and duration
Useful free features such as AI Parser, 100+ ready made templates,125M+ IPs, JavaScript rendering, and automated IP rotation.

Pricing

  • Free: 1,000 free API calls (7-day trial).
  • Core: from $0.08 (1,000 requests)
  • Advanced: From $0.95 (1,000 requests)
  • Enterprise: custom pricing for larger volumes and dedicated support

For a detailed comparison of scraping capabilities, pricing, and success rates, check out the best Decodo alternatives.

6. Webscraper.io

Webscraper.io is a user-friendly web scraping tool that requires no coding skills. It offers a dedicated cloud scraper and is available as a browser extension for Chrome and Firefox. It allows users to create sitemaps using a simple point-and-click method.

Webscraper.io scraping infrastucture dashboard page

For users with more complex needs, WebScraper provides a Cloud Scraper service that automates data collection, supports scheduling, and offers integration with various platforms.

The cloud scraper functions as a powerful business analytics resource, dynamically extracting data from websites, analyzing it in real-time, and generating detailed reports that can be sent to your preferred cloud platforms, such as Amazon S3, Google Sheets, and DropBox.

Pros and cons

Pros Cons
Point-and-click interface integrated with browser developer toolsThe free browser extension is limited to local use and may not be suitable for large-scale projects
Community sitemaps for popular websitesAdvanced features, such as proxy support and API access, require a paid subscription
Cloud-based execution (paid plans only)Handling complex websites may necessitate a learning curve for new users

Pricing

  • Browser Extension: Available at no cost for local use, ideal for users who want to run scrapers on their own machines.
  • Project Plan: Priced at $50 per month, includes 5,000 cloud credits and allows for 2 simultaneous tasks.
  • Professional Plan: Costing $100 monthly, provides 20,000 cloud credits, and supports 3 simultaneous tasks.
  • Business Plan: At $200 per month, offers 50,000 cloud credits and supports 5 simultaneous tasks.
  • Scale Plan: Starting at $200 monthly, features unlimited cloud credits.

7. ScrapingBee

Our final scraping tool on the list is ScrapingBee. ScrapingBee offers an API for web scraping that handles complex JavaScript pages and converts them into raw HTML for you to use. Moreover, it has a dedicated API for web scraping using Google search. With built-in proxy management and headless browser support, ScrapingBee is particularly beneficial for tasks like price monitoring, SEO analysis, and data extraction.

ScrapingBee scraping infrastructure dashboard

ScrapingBee offers a free tier of 1,000 credits per month. However, this is impractical due to the platform’s relatively high credit consumption. It’s also worth noting that they have introduced a new AI extraction feature (currently in beta), which carries an additional cost of 5 credits per use on top of the regular API cost.

Pros and Cons

ProsCons
Easy IntegrationHigher-tier plans can be costly for small-scale projects
Includes additional features like screenshot captureSteeper learning curve for custom JavaScript execution
Good DocumentationLimited free trial for extensive testing

Pricing

  • Free: 1000 free API calls.
  • Freelance: $49 per month (150,000 API credits).
  • Startup: $99 per month (1,000,000 API credits).
  • Business: $249 per month (3,000,000 API credits).
  • Business +: $599+ per month (8,000,000+ API credits).

For a detailed comparison of scraping capabilities, pricing, and success rates, check out the best ScrapingBee alternatives.

5 Free AI-Powered Web Scraping Tools

AI web scraping tools automatically extract data from websites without manual intervention. Many popular web scraping platforms now include built-in AI parsers that identify and gather the precise information you need, making data collection faster and more efficient.

Let’s look at some of the top free AI scraping alternatives available in 2026:

8. Bardeen.AI

Bardeen is an AI agent that effortlessly performs scraping tasks with a simple prompt. It automates manual workflows and saves you time. Bardeen AI is currently available as a Chrome browser extension and has hundreds of pre-built playbooks to handle most automation tasks.

Bardeen AI web scraper homepage

Bardeen.AI caters to multiple other tasks, such as creating other scraper templates and sending data to other apps. It offers deep scraping, pagination, and automated click actions. It can also integrate directly with your spreadsheets and other apps to enhance data analysis, and it is free on Chrome, which is another plus point.

Pros and Cons

ProsCons
Automates data extraction with simple AI promptsFree plan is very limited (100 credits)
Integrates easily with spreadsheets and other appsOnly available as a Chrome extension
Cloud automation workflows
Free plan available

Pricing

While Bardeen.AI includes a free plan that allows users to get started at no cost, it comes with notable limitations. You receive 100 credits, which equates to roughly 100 scraped rows. This significantly caps the scale of your operations.

For more capacity, the paid plans start at around $30/month (billed annually) for up to 18,000 credits; higher-tier custom plans offer up to 120,000 credits.

9. Browse AI

Browse AI is a no-code web automation platform that enables users to extract and monitor data from websites efficiently. The platform does not require sophisticated learning, as most users can gain proficiency within 5 minutes.

Browse AI web scraping tool homepage

Browse.AI supports scheduling and data integration with tools like Google Sheets and Airtable. It adapts to website layout changes, and its bulk run feature allows you to extract data across multiple URLs. You can start by using the tool from your browser. No downloads are necessary.

Pros and Cons

ProsCons
Easy-to-useHigher-tier plans may be costly for small businesses
Integration with 5000+ appsThe learning curve for advanced features and workflows may be steep
Scheduling and change monitoring featuresIt might require periodic retraining for very dynamic sites
Prebuilt robots

Pricing

  • Free Plan: Limited features for basic usage (50 credits per month). 
  • Starter Plan: $48.75 per month (2,000 credits per month). 
  • Professional Plan: $123.75 per month (5,000 credits per month)
  • Team Plan: $311.25 per month (10,000)
  • Company plan: Custom

10. Diffbot

Diffbot is an AI-powered web data extraction tool that offers algorithms that can crawl the web and extract valuable data from web sources such as articles, discussions, and other types of pages. These algorithms can then organize and convert this data into structured formats.

Diffbot AI web scraping tool homepage

Pros and Cons

ProsCons
High-quality structured data outputsMore technical users may prefer explicit selector control
Works well for news, ecommerce, and product dataHigher-tier plans are expensive for small businesses
Knowledge graphsA credit-based system may require careful monitoring to avoid overages
There is a potentially difficult learning curve

Pricing

  • Free Plan: $0/month, provides 10,000 credits, five calls per minute, and dashboard access.
  • Startup Plan: $299/month, provides 250,000 credits, five calls per second, and API access.
  • The Plus Plan: Costs $899/month and includes 1,000,000 credits, 25 calls per second, and additional features such as Crawl and bulk scraping.
  • Enterprise Plan: Custom pricing.

For a detailed comparison of scraping capabilities, pricing, and success rates, check out the best Diffbot alternatives.

11. ScrapeStorm

ScrapeStorm is an AI-powered web scraping tool designed to extract data from various websites without requiring coding skills, making it suitable for both beginners and seasoned professionals.

ScrapeStorm AI web scraping solution homepage

ScrapeStorm also utilizes rotating IPs to prevent blocking during data extraction, and it’s compatible with Windows, Mac, and Linux. It offers two modes: Smart Mode, which utilizes artificial intelligence to automatically identify data patterns, and Flowchart Mode, allowing users to define scraping rules through a desktop visual interface.

Pros and Cons

ProsCons
Fast and supportive customer service responsesFree tier constraints on data volume
Generous trial packages with excellent student discount offersAdvanced customization requires paid plans
Intuitive user interfaceInconsistent performance
AI-Powered Data Recognition

Pricing

Regarding pricing, ScrapeStorm offers a free trial during which you can scrape up to 10 tasks. However, only one task can run concurrently. Other plans include:

  • Professional – $49.99 pm
  • Premium – $ 99.99 pm
  • Business – $ 199.99 pm

12. Databar.ai

Databar.ai is a no-code platform for automating data collection, enrichment, and visualization. It enables users to scrape data from websites easily and use this data to create dynamic reports and visualizations.

Databar AI web scraping tool homepage

One of Databar’s standout features is its ability to generate leads from Google Maps. After inputting your target location and business category, the platform scrapes relevant business data, including names, addresses, phone numbers, and websites.

Pros and Cons

ProsCons
Data visualization with Live ChartsSteeper learning curve for new users
Access to over 120 data sourcesLimited features on lower-tier plans
AI-powered lead qualificationCan become expensive for high-volume users

Pricing

  • Lite Plan: $36/month with 2,000 credits.
  • Pro Plan: $99/month with 7,500 credits.
  • Team Plan: $250/month for 20,000 credits.
  • Custom Enterprise Plans: Available for larger teams.

Must-Have Features of a Reliable Web Scraping Tool

Choosing the right web scraping tool is very difficult but essential at the same time.  As you can see from the article, every web scraper is different, so selecting the one that suits your needs best can be a challenging task.

Nevertheless, there are particular features and factors to consider when reaching your final decision. This can assist you in determining if this tool will help you or your business meet your goals. Here are several key features to focus on:

  • Ease of use (especially if you’re new to scraping)
  • Flexibility in handling different types of websites and data formats
  • Adaptability and speed, especially when processing large data volumes
  • Compatibility with website layout changes
  • Intuitive interface and detailed documentation for an effortless process

If You’re New to Web Scraping: What is a Web Scraper?

Simply put, a web scraper is a software program that extracts data from a website. Web scraping is a technique used to extract large amounts of public data from websites. This information is collected and exported into a more user-friendly format, such as a spreadsheet or an API, where it is stored for further analysis or manipulation.

Common Web Scraper Use Cases

Web scraping tools are versatile and serve numerous purposes. Companies often gather data for tasks like market research, price monitoring, and competitive analysis. By understanding competitor pricing and product details, businesses can sharpen their strategies and gain an edge. 

Explore our “5 Small Business Web Scraping Use Cases” guide for more hands-on examples and recommendations.

ScraperAPI Is the Best Web Scraping Tool to Support Your Data Collection Needs

If you’re trying to scrape websites where you need to get around CloudFlare, bypass captchas, or use rotating proxies, you may want to use a web scraping API. For this, I can’t recommend ScraperAPI enough. Create a free ScraperAPI account and start scraping in minutes!

FAQs about Free & AI Web Scraping Tools

What is web scraping?

Web scraping is a technique used to programmatically collect content and data from the internet, such as getting eBay product prices and Amazon product catalogues. This information is collected and exported into a more user-friendly format, such as a spreadsheet or an API, to be analyzed, fed to LLMs, etc.

Can I use AI to scrape the web?

Yes, you can use AI to scrape the web. AI-powered scrapers use machine learning and natural language processing to automatically identify data patterns and adjust to site changes. This reduces manual maintenance and speeds up the data collection process.

Can ChatGPT do web scraping?

Out of the box, ChatGPT does not perform web scraping. It is a language model without direct access to the open internet. However, developers can integrate APIs or scraping tools with ChatGPT to summarise or analyze scraped data after collection.

What is the best AI model for web scraping?

There isn’t a single “best” AI model for web scraping. Different tools use various proprietary AI engines, each offering different strengths in handling complex website structures and adapting to dynamic content with AI-powered extraction capabilities. However, GPT-4 and other specialized AI extraction models like those from OpenAI and Google are leading the way in web scraping in 2026.

Is ParseHub completely free?

ParseHub offers a free plan, but it’s limited in terms of the number of pages per run and total projects you can manage. Upgrading to a paid plan unlocks more pages, faster processing, and additional support.

What is the best free no-code web scraper?

ScraperAPI is one of the best free, no-code web scraping solutions available. It handles all the complex parts of scraping—such as proxy rotation, CAPTCHA solving, and JavaScript rendering—so you don’t have to worry about technical details. Its generous free tier allows you to test it out at no cost, making it an excellent choice for beginners and experienced users looking to simplify their scraping workflows.

About the author